Assembling The Cross Connector And Foundation Bracket - Bosch rexroth SE 2/C Series Assembly Instructions Manual

Table of Contents

Advertisement

1.
Install the cross
connectors between the
leg sets.
2.
Align the conveyor unit
fl ush, horizontally and
by height.
3.
Secure the conveyor
unit to the fl oor.
For each connection,
you will need:
– 1x foundation bracket,
3 842 146 815
– 1x dowel,
3 842 526 560
– 2x T-bolt, 3 842 528 718
– 2x fl ange nut,
3 842 345 081
Please note:
• Max. distance between
2 cross connectors:
2000 mm.
7.6.7

Assembling the cross connector and foundation bracket

SE 2/C...
m m
SE 2/R...
0 0
QV
2 0
a x
3 842 994 635
≤ m
b
SW13
M = 25 Nm
D
SW24
M = 25 Nm
D
SW13
M = 25 Nm
D
AS 2/..
Fig. 20:
Assembling the cross connector and foundation bracket
0 0
SE 2/C-H...
2 0
SE 2/R-H...
a x
≤ m
SE 4/R-H-V...
b
SW13
M = 25 Nm
D
m m
0 0
2 0
a x
≤ m
3 842 528 718
SW17
M = 25 Nm
M = 25 Nm
D
Ø 8
SZ 2
3 842 358 737/2022-08, MIT: SE 2/C-..., SE 2/R-..., Bosch Rexroth AG
Assembly
35/108
m m
QV 2
3 842 993 052
3 842 345 081
1
2
SW13
D
3 842 146 815
3 842 526 560
UM 2/..
SZ 2
358 736-28

Advertisement

Table of Contents
loading

Table of Contents