fD
-
Use new lock rings
with every repair.
18.4.40
Assembling the main shaft
Info
Use new lock rings with every repair.
Preparatory work
-
Check the transmission.
-
Carefully lubricate all parts before assembling.
Main work
-
Secure the main shaft in the vise with the gear teeth facing downward.
Guideline
I Use soft jaws.
0,
-
Mount needle bearing
CD
-
Mount stop disk
and lock ring
-
Attach third/fourth-gear sliding gear
ring (D.
-
Mount stop disk @ and needle bearing
-
Mount sixth-gear idler gear Q) with the shift dogs facing downward.
-
Mount second-gear fixed gear 41) with the collar facing downward and mount stop disk
-
Finally, check all the gear wheels for smooth operation.
18.4.41
Assembling the countershaft
Info
Use new lock rings with every repair.
(l!!JI
p. 205)
and mount fifth-gear idler gear
e.
0
with the small gear wheel facing downward and mount lock
fD.
306576-11
8
with the shift dogs facing up.
18 ENGINE
4D.
207