Chassis Mid-Mounted Rack-Mount Bracket Installation - Cisco RF Gateway 10 Quick Start Manual

Cisco systems rf gateway quick start guide
Hide thumbs Also See for RF Gateway 10:
Table of Contents

Advertisement

Step 1
Locate the threaded holes on the front sides of the chassis that align with the holes in the rack-mount bracket. Ensure
that you hold the front rack-mount bracket with the ear and holes facing outward and towards the front of the chassis
(see Figure 5).
Step 2
Install all six M5 undercut flat head screws (provided in the accessory kit) to secure each of the rack-mounting bracket
to the chassis. Three screws are installed on each end of the rack-mounting bracket.
Repeat Step 1 through Step 2 on the other side of the chassis.
Step 3
Install the chassis in the rack. To install the Cisco RFGW-10 UEQAM in the rack, go to Installing the Cisco RFGW-10
Step 4
UEQAM in a Rack, page 11.
Figure 5
Attaching the Front Rack-mount Brackets
1
1
Front rack-mount bracket
2
Cisco RFGW-10 UEQAM Chassis

Chassis Mid-Mounted Rack-Mount Bracket Installation

If you are rack-mounting the chassis using a mid-mounted configuration, then it provides for the chassis being recessed in the
rack or installed in a two-post rack.
Chassis installation handles cannot be installed if the chassis is to be mid-mounted.
Note
10
2
3
Front rack-mount bracket screws
3
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rfgw-10

Table of Contents