Before Using The Drive; Acceptance Inspection - GE Fuji Electric AF-300 Mini Startup Manual

Hide thumbs Also See for Fuji Electric AF-300 Mini:
Table of Contents

Advertisement

1. Before Using the Drive

1.1 Acceptance Inspection

Unpack and check the following items.
(1) A drive and instruction manual (this manual) is contained in the package.
(2) The drive is not damaged during transportation – no dents.
(3) The drive is the model you ordered. You may check the model name printed on the nameplate (see Figure 1.1).
INPUT:
Number of input phases (3-phase: 3-ph, 1-phase: 1-ph), input voltage, input frequency, input current
OUTPUT: Number of output phases, rated output
capacity, rated output voltage, output frequency range, rated output current, overload capacity
SER. NO.: Product number
3 9 0 1 1 2 R 0 0 0 1
If you suspect the product is not working properly or if you have any questions about it, contact your dealer or
GE Fuji.
Figure 1.1 Nameplate
Serial number of production lot
Production month
1 to 9: January to September
X, Y, or Z: October, November, or December
Production year: Last digit of year
1-1