Indoor installation

The KTR-11 face/badge reader is housed in a stainless steel enclosure designed primarily for flush mounting.
However, a surface mounting flange is available for situations where flush mounting is not possible.

Flush-mount installation

The KTR-11 is designed to be easily mounted in almost any wall using KTR-11-15 wall brackets (included).
To flush-mount the unit, do the following:
1. Make wall cutout to the dimensions of 20.4 x 9.2 x 3.75 in. (HxWxD). The bottom of the cutout
should be 48 in. from the floor (Figure 2).
2. Bring wires and cables into the KTR-11 through the appropriate openings and insert the KTR-11 unit
in the wall cutout.
3. Slide the wall brackets into the slots at the top and bottom of the KTR-11, as shown.
4. Thread the screws provided through the slots in the brackets, but do not tighten.
5. Pull each bracket firmly toward the front so that the drywall is pinched securely between the bracket
and the KTR-11 frame, and tighten the screws.
Figure 2. Flush-mount installation using KTR-11-15 wall brackets
Cut hole in wall as shown.
Wall may be 0.5 to 1.0 in. thick.
KTR-11-15 wall brackets
9.2 in.
(234 mm)
20.4 in.
(518 mm)
48 in. to floor
(1.22 m)