Section 4: Installing The Amplifiers - Honeywell Gamewell-FCI AA-100 Installation & Operation Manual

Table of Contents

Advertisement

Section 4: Installing the Amplifiers

The AA-100/AA-100E and AA-120/AA-120E amplifiers mount directly in the FCI-DR-C4B or
DR-D4B backbox. Use the two #8 nuts and lock washers provided to secure the amplifier to the
PEM studs on the back panel of the backbox.
Figure 4.1 illustrates the DR-D4B cabinet installation.
Amplifier
#8 lockwasher
DR Series Cabinet
Figure 4.1 DR Series Cabinet Diagram
12
AA-100/AA-120 Audio Amplifiers Installation/Operation Manual — P/N 9000-0573:C 03/12/2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gamewell-fci aa-12

Table of Contents