Installation Review

This chapter describes the necessary number of technicians required to install the
machine properly, the time required to install the main unit and optional equipment,
and customer installation responsibilities.

8.1 Installation Time

The time required to install the Océ VarioPrint 135 depends on the options and
accessories to be installed, and the number of technicians performing the
installation. Customers should discuss the time requirements with their servicing
dealer and schedule the installation accordingly.
The table below indicates the estimated length of time needed to unpack and
install the machine and optional accessories, and calculated from the average
amount of manpower hours. The estimated installation times are based on a
minimum of two (2) experienced technicians.
Main Unit
Operator Panel
Operator Attention Light-C1
Duplex Color Image Reader-D1
ePIM-C1
Document Insertion Unit-F1
High Capacity Stacker-E1
Second High Capacity Stacker-E1
High Capacity Stacker-F1
Second High Capacity Stacker-F1
Paper Folding Unit-F1
Finisher-AF1/Saddle Finisher-AF2
Booklet Trimmer-D1
Two-Knife Booklet Trimmer-A1
SDD Square Fold Booklet-Maker & Two-Knife Trimmer
SDD Square Fold Booklet-Maker

8.2 Customer Responsibilities

Identify location for equipment.
Verify strength of floor and level.
Ensure that the equipment can be
delivered to the site.
Confirm proper electrical outlets and
power are available.
Area meets environmental
specifications.
Network connections available.
Version 7
Océ VarioPrint 135 Customer Expectations Document
Description
Item
Comment
Area meets installation space and service space
requirements.
Certified by structural engineers.
Path is clear and unobstructed.
Dedicated power, and enough outlets for equipment
(including accessories).
Temperature and humidity are within specifications,
venting provided if necessary.
If desired.
Estimated Time
3 hours
15 minutes
5 minutes
13 minutes
45 minutes
10 minutes
12 minutes
15 minutes
60 minutes
60 minutes
11 minutes
12 minutes
28 minutes
11 minutes
120 minutes
120 minutes
Page 38