The RT412 is ruggedized and specifically designed for operation and to be part of the
large scale electrical fixed installations, as electrical power generation installations,
electrical substations and electrical utilities control systems.
Unpack the unit carefully and make sure all the accessories and cables are put aside so
they will not be lost.
Check the contents against the packing list that goes with the product. If any of the
content listed is missing, please contact GE Grid Solutions (see contact information in
Maintenance chapter).
Examine the unit for any shipping damage. If the unit is damaged or fails to operate,
notify the shipping company without delay. Only the consignee (the person or company
receiving the unity) can file a claim against the carrier for shipping damage.
We recommend you to keep the original packing materials for possible transport in the
future.
In order to maintain the equipment integrity, levels of protection and assure user
safety, the RT412 must be installed in an enclosed panel with recommended ingress
protection rating of IP54 or above.
The enclosing panel must ensure that the equipment is unexposed and protected
against impact and water, whilst maintaining adequate temperature and humidity
condition for the devices. Furthermore, the equipment must have all their connectors
attached, even if not being used, to keep their levels of ingress protection as high as
possible.
RT412 has been designed to be mounted in a standard DIN-rail.
Keep adequate clearance for all connections. In particular, the optical fiber cables
should be installed in compliance with the 30 mm minimum bending radius.