21. Return the system to normal operation.
22. Make sure all readings are in the required ranges be-
fore proceeding.
NOTE: Upon completing these tests, open the master
switch and remove all test jumpers from the subbase
terminals, limits/controls or switches.
INITIAL LIGHTOFF CHECK FOR DIRECT
SPARK IGNITION
This check applies for gas and oil burners that do not use
a pilot. It should immediately follow the preliminary in-
spection. Refer to the appropriate sample block diagram of
field wiring for the ignition transformer and fuel valve(s)
hookup.
NOTE: Low fuel pressure limits, if used, could be open. If
so, bypass them with jumpers during this check.
1. Open the master switch.
2. Complete the normal checkout of the fuel supply and
equipment as recommended by the equipment manufacturer.
3. Close all manual main fuel shutoff valve(s). Check
that the automatic fuel valve(s) are closed. Make sure fuel
is not entering the combustion chamber.
4. Close the master switch and start the system with a
call for heat by raising the set point of the operating
controller, see Figs. 15, 16 or 18. The primary sequence
should start the ten-second INITIATE sequence.
5. Let the sequence advance through PREPURGE. Ig-
nition spark should occur after the PREPURGE period.
Listen for the click of the first stage fuel solenoid valve(s).
6. Let the program sequence complete its cycle.
7. Open the manual fuel shutoff valve(s).
8. Reset the Lockout Switch and recycle the primary
sequence through PREPURGE.
9. Watch for the FLAME LED to help determine when
the first stage burner flame is established. If it is estab-
lished, proceed to step 15.
10. If the first stage burner flame is not established
within four seconds, or within the normal lightoff time
specified by the equipment manufacturer, close the manual
fuel shutoff valve(s), and open the master switch.
11. Check all burner adjustments.
12. Wait about three minutes. Close the master switch,
open the manual fuel shutoff valve(s), and try again to lightoff
the burner. The first attempt may have been required to purge
the lines and bring sufficient fuel to the burner.
13. If the first stage burner flame is not established with-
in four seconds, or within the normal lightoff time specified
by the equipment manufacturer, close the manual fuel shutoff
valve(s) and open the master switch.
14. If necessary, repeat steps 8 through 13 to establish
the first stage burner flame. Then proceed to step 15.
15. When the first stage burner flame is established, the
sequence will advance to RUN. Make burner adjustments for
flame stability and input rating. If a second stage is used,
proceed to step 18.
16. Shut down the system by opening the burner switch or
by lowering the set point of the operating controller. Make
sure the burner flame goes out and make sure all automatic
fuel valve(s) close.
17. If used, remove the bypass jumpers from the low fuel
pressure limit and subbase.
18. If a second stage is used, make sure the automatic
second stage fuel valve(s) has opened and check the light-
off as follows. Otherwise proceed to step 19:
a. Open the manual second stage fuel valve(s).
b. Restart the system by raising the set point of the
operating controller.
c. When the first stage burner flame is established,
watch for the automatic second stage fuel valve(s)
to open. Observe that the second stage lights off
properly.
d. Make burner adjustments for flame stability and
input rating.
e. Shut down the system by lowering the set point of
the operating controller. Make sure the burner
flame goes out and all automatic fuel valve(s) close.
19. Restart the system by closing the burner switch and/
or raising the set point of the operating controller. Observe
that the burner flame is established during PILOT IGN,
within the normal lightoff time specified by the equipment
manufacturer.
20. Measure the flame signal. Continue to check for the
proper signal, see Table 5, through the RUN period. Any
pulsating or unsteady readings will require further attention.
21. Make sure all readings are in the required ranges be-
fore proceeding.
NOTE: Upon completing these tests, open the master
switch and remove all test jumpers from the subbase
terminals, limits/control or switches.
22. Return the system to normal operation.
PILOT TURNDOWN TEST (All Installations
using a Pilot)
Perform this check on all installations that use a pilot.
The purpose of this test is to verify that the main burner can
be lit by the smallest pilot flame that will hold in the flame
amplifier and energize the FLAME LED. Clean the flame
detector(s) to make sure that it will detect the smallest
acceptable pilot flame. If using AMPLI-CHECK™ or Self-
Checking Amplifier and 20 kohm/voltmeter, the flame
signal will fluctuate every time the amplifier does a self-
check or a shutter check.
NOTE: Low fuel pressure limits, if used, could be open. If
so, bypass them with jumpers during this test.
1. Open the master switch.
2. Close the manual main fuel shutoff valve(s).
3. Connect a manometer (or pressure gauge) to measure
pilot gas pressure during the turndown test.
4. Open the manual pilot shutoff valve(s).
5. Close the master switch and start the system with
a call
for heat. Raise the set point of the operating
controller. The primary sequence should start and
PREPURGE should begin.
25
RM7840E,G,L,M
CHECKOUT
65-0086—2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rm7895bRm7895cRm7895d7800 series rm7895a

Table of Contents