Installation Environment; Associated Equipment - GE SymNet1 User Manual

Table of Contents

Advertisement

4
SymNet1
User Manual

Installation environment

You should consider the following environmental elements when installing the SymNet1:
Power: Ensure that the site's AC power is stable and within the rated voltage of the external power
supply. If the site's AC power is likely to have spikes or power dips, use power line conditioning or
an uninterruptible power supply (UPS).
Ventilation: Install the unit in a well-ventilated area. Take note of the locations of the cooling vents in
the unit's enclosure, and ensure that they are not obstructed.
Temperature: Observe the unit's ambient temperature specifications when choosing a location space.
Extremes of heat or cold beyond the specified operating temperature limits may cause the unit to
fail. Do not install the unit on top of other hot equipment.
Moisture: Do not expose the unit to rain or moisture. Moisture can damage the internal components.
Do not install this unit near sources of water.

Associated equipment

You may need the following associated equipment:
SymVeo SV-XP1 IP camera.
Analog monitor to view video.
Alarm input devices such as pressure sensors and motion detectors.
Alarm output devices such as buzzers, sirens, and flashing lights.
PC connected via an ethernet cable.
Slotted screwdriver with a tip size of 2 cm or smaller.
For instructions regarding the connection of the associated security equipment in your system, please consult
the instruction manual of the associated equipment.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Symnet1-5rc

Table of Contents