value.
NOTE2: Our warranty applies the maximum output power measured by a solar simulator with
Standard Test Condition (STC), (i) after ambient temperature in the sunshine report by
the Meteorological Agency have reached 20 degree C for at least 20 consecutive days or
(ii) after having the modules annealed with the given conditions (90 degree C, 48 hour)
and having the light-soaking tests which are performed in accordance with clauses
10.19.1 – 10.19.3 of IEC61646 Ed.2.
NOTE 3: The maximum output power measurement tolerance by a solar simulator with STC on a
system calibrated by Sharp is ±3.5%.
4.6.2.2 Insulation
This module satisfies the requirement of Dielectric withstand test in accordance with
IEC61730-2.
4.6.3 Mechanical performance
4.6.3.1 Withstanding mechanical load
This module satisfies the requirement of mechanical load test at 2400Pa in accordance with
IEC 61646 Ed.2.
4.6.3.2 Withstanding the impact of hailstone
This module satisfies the requirement of hailstone test in accordance with IEC 61646 Ed.2.
4.6.3.3 Robustness of termination
This module satisfies the requirement of robustness of terminations in accordance with IEC
61646 Ed.2.
5. SHIPPING TEST
Each shipping lot shall successfully pass the shipping tests below.
5.1 Total inspection.
5.1.1 Sampling way
All shipping lot is inspected.
5.1.2 Inspection items
The maximum power (Pmax) is measured in the production line process by flasher data
report (power measurement tolerance: ±3.5%).
5.2 Sampling inspection
5.2.1 Sampling way
Sampling shall be done by extracting at production articles.
5.2.2 Inspection items
Test items shall be the dimension, the appearance and the insulation tests.
6. PREPARATION FOR DELIVERY
The shipping carton box specification is shown in Fig. 4 or Fig. 5.
7. WARNING
The items regarding the warning are shown as below and in the installation manual, general
installation manual and user manual.
MTA14004