Honeywell Fusion4 MSC-L Installation & Operation Manual page 265

Table of Contents

Advertisement

Part No.: 4418309_Rev09
Honeywell
Operation - Dual Bay Loading Application Overview
 Load GOV: The gross observed volume of the product loaded.
After the transaction is complete, the Transaction details screen
appears.
10. If you want to end the transaction, press Yes. The transaction is
successfully completed.
NOTE:
Permissives per bay: Grounding, Overfill, Vapor (DI).
Transaction records are created simultaneously per bay.
Fusion4 Portal prints the first finished transaction first.
The workflow is identical for each bay. However, the workflow is
executed independent from each other.
The STOP button on the keyboard pauses all running arms on both
bays with the ability to stop or resume the arms per "HMI bay focus".
Fusion4 MSC-L
Installation & Operation Manual
5 - 77

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Enraf fusion4 msc-l

Table of Contents