• Ensure that the base station can communicate with the network (see
5). After it can communicate and the LED is green, you can unplug the cables.
Determine the best placement, taking into account the coverage area and the building construction materials.
You may need to install addition base stations for best coverage.
You can use the site survey tool on the handset to plan placement.
Procedure
Step 1
Hold the level in the desired location and at least 2.25 inches (5.7 cm) below the ceiling, and draw a level
line.
Step 2
Mark the placement of the screws.
• Without the ceiling mount bracket: Mark the line so that the screws are 2.126 inches (54 mm) apart
(center to center).
• With the ceiling mount bracket: Hold the bracket so that two of the holes intersect the line. Mark the
holes.
Step 3
Install the wall plugs as described by the manufacturer.
Step 4
Insert the screws.
• Without the ceiling mount bracket: Screw in the screws until there is about 0.375 inches (9.52 mm)
between the screw head and the wall.
Mount the Base Station on the Wall
Install the Base Station, on page