Honeywell GENT Nano panel-based Commissioning Instructions page 4

Fire detection and alarm system
Table of Contents

Advertisement

Commissioning instructions
Preface
This is the third issue of the Commissioning instructions for the fire alarm system based on the
Nano panel with Main Controller at version 2.xx.
Associated documents
2531-221 Document Pack
- Quick reference / Drilling template
- Installation instructions
- Operating instructions
- Log book
Conventions
"
This is a note to highlight important text that is normally hidden in the main text.
&
This is either a caution to prevent damage to the equipment or a
warning to inform of dangerous conditions that may result in injury or death.
Symbol Keys
What you will see
What you will hear
4
"
Once the Nano system 'Loop' is
fully commissioned, the system is
ready to be configured. This should
be done using the Nano
commissioning tool.
Although this manual documents
the configuration menus at the
panel, it is recommended you use
the Nano commissioning tool to
configure the system.
4188-949 issue 3_05/10_Nano Comms inst.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents