Initial Commissioning; Operating Displays - Honeywell ACC 50 Installation Instructions Manual

Access control system for up to 99 contactless id cards
Hide thumbs Also See for ACC 50:
Table of Contents

Advertisement

Available languages

Available languages

28
10.

Initial commissioning

After applying the operating voltage, the yellow LED lights up permanently.
Hold the RESET card in the field.
The red and yellow LEDs light up simultaneously for approx. 10 seconds. All system memories are
cleared. The yellow LED then flashes every 2 seconds - the device is ready to operate.
11.

Operating displays

LED
yellow
yellow
yellow
green
red
LED Function
Flashes every 2
seconds
Flashes quickly
Permanently lit up
Lights up for several
seconds
Lights up for approx. 2 sec.
Installation Instructions ACC 50
Meaning
Device is in normal
operation
Device is in programming or
clear mode, triggered by the
PROGRAM or CLEAR card
Device is ready for creating the
programming card set
or
memory must still be cleared
with the RESET card
(initial commissioning)
Release relay is energized
ID card is not authorized

Advertisement

Chapters

Table of Contents
loading

Table of Contents