Download Print this page

Installation Instructions; Troubleshooting - Honeywell HPR2416CBUL Quick Start Manual

Cctv rack mount power supply/distribution units

Advertisement

3 Installation Instructions

1.
Unpack product. Do not discard packing materials until installation and checkout are successfully completed.
2.
Mount unit in 19" rack only. Do not obstruct side air vents.
3.
Verify that power switch on back of unit is in the OFF position (See Figure 2 - Rear View of Power Supply).
4.
Plug power cord into grounded 117V, 60Hz receptacle.
5.
Set power switch on back of unit to ON (RESET) position and verify output voltage. Set power switch on back of
unit to the OFF position.
6.
Connect CCTV cameras (or other external loads) to appropriate terminals. Connect circuit #1 to terminals marked
"1P" and "N". Connect circuit #2 to terminals marked "2P" and "N". Continue to connect the remaining circuits
carefully observing phase. Terminals marked with "P" are of the same phase.
7.
Upon completion of wiring, set the power switch on back of the unit to the ON (RESET) position. The red power
indicator on the power switch should illuminate.
8.
All sixteen green LEDs on faceplate should illuminate. If an output has a blown fuse or tripped PTC the
corresponding LED will not illuminate.
9.
Upon completion of wiring, secure terminal blocks by tightening screws on flanges..

4 Troubleshooting

1.
If the red power indicator on the power switch is not illumated:
– Verify that 117VAC power is present at receptacle.
– Verify that the unit is plugged into the 117VAC power receptacle.
– Verify that the power switch is in the ON (RESET) position.
– Try resetting the circuit breaker in the power switch by setting to OFF position then back to ON (RESET) position.
2.
If none of the green LEDs on faceplate are illuminated while power switch is illuminated:
– Set power switch on back of unit to the OFF position.
– Unplug power cord from receptacle.
– Remove field wiring to affected circuit(s) and check for shorts and overloads.
– Replace field wiring after resolving any shorts and/or overload conditions.
– Replace blown AC line fuse as follows:
•.Remove the six screws holding front panel and remove the front panel.
•It is not necessary to remove unit from rack.
•Do not attempt to remove cover.
•Replace blown fuse(s).
•Replace and secure front panel.
– Plug power cord into receptacle.
– Set power switch on back of unit to the ON (RESET) position.
3.
If any of the sixteen green LEDs on faceplate are not illumated while power switch is illuminated:
– Set power switch on back of unit to the OFF position.
– Unplug power cord from receptacle.
– Remove field wiring to affected circuit(s) and check for shorts and overloads.
– Replace field wiring after resolving any shorts and/or overload conditions.
– Replace blown fuses on HPR2416UL as follows:
•Remove the six screws holding front panel and remove front panel.
•It is not necessary to remove unit from rack.
•Do not attempt to remove cover.
•Replace blown fuse(s).
2