600-1200 Amps - GE ZTS Series Operation And Maintenance

Transfer switches 40-4000 amps
Table of Contents

Advertisement

Replacement Parts
Delayed Transition - 600 to 1200 Amps
Tag
Description
NL 1,2,3
EL 1,2,3
Cable Connection Lug, CU Wire
T
1,2,3
NN, EN, TN
Stationary Contact Assembly Kit
Arc Grid Assembly Kit
Movable Contact Assembly Kit
Movable Contact
RN/RNO
Coil Rectifier
RE/REO
SN/SNO
Limit Switch
SE/SEO
Limit Switch
A3
Emergency Position Auxiliary Contact
A4
Normal Position Auxiliary Contact
DS
Disconnect Switch
CN/CNO
Main Operator Solenoids
CE/CEO
Volts
Ph
240
3
120/208
3
480
3
277/480
3
240/416
3
32
ZTS / ZTSD Operation and Maintenance Manual (71R-3000)
(cont'd)
Recommended
as Spares
Wire
Coil VDC
3
240
4
208
3
480
4
480
4
416
Stock Numbers by Amperage
p
600-800
S-1383F
(2) 500MCM-2
23P-1471
23P-1358
23P-1469
23P-1470
23P-1473 (Up to 240 VAC)
*
23P-1582 (Up to 600 VAC)
23P-1535(L); 23P-1533(R)
23P-1536(L); 23P-1534(R)
Operator: L-4009; Contact Block: L-1020
*
See Chart Below
*
Solenoid Part No.
Pole
600
3
K-2145
3,4
K-2146
3
K-2158
3,4
K-2158
3
Consult Factory
Figure 24
1000-1200
2-1392F
(4) 600MCM-2
26P-1336
23P-1366
26P-1334
26P-1335
23P-1536
23P-1535
800-1200
K-2147
K-2147
K-2157
K-2157
GE Zenith Controls

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ztsd series

Table of Contents