GE Grid Solutions
G500 Substation Gateway,
Quick Start Guide
The rack mounting kit includes 4 metal pieces (left bracket, right bracket, top filler plate and the bottom filler plate) along with M4
(quantity 10) and M3 (quantity 8) screws. The M4 screws are used to attach the left and right bracket to the G500 chassis and the
M3 screws are used to secure the top and bottom filler plates to the brackets.
2
SWM0106-1.00-0
GE Information