Installation - Motorola SC 4812ET RF Hardware Installation Manual

Power cabinet
Table of Contents

Advertisement

SC 4812ET – SC 614/SC 614T Companion Frame Installation
Table E-2: Removing the Duplexers (RX2, RX4 and RX6) from the SC 614
n
Step
6
After removing the three (3) diversity duplexers (RX2, RX4 and RX6), slide the top and bottom
brackets back to their original positions and torque the six (6) M6 nuts to 5 N–m (45 in–lbs)
7
Install six Type N bulkhead connectors to the Main Ground Bar (MGB) in the holes for RXa2 IN,
RXb2 IN, RXg2 IN, RXa1 OUT, RXb1 OUT, and RXg1 OUT (see Figure E-5). Tighten the hex
nuts from the bottom of the MGB to 4 N–m (35 in–lbs).
8
Install a DC block surge arrestor onto the Type–N bulkhead connectors. RXa1 OUT, RXb1 OUT,
and RXg1 OUT. Torque to 4 N–m (35 in–lbs.).
9
Install the BTS labels TX1/a1, TX2/b1 and TX3/g1 over the TX1/RX1, TX2/RX3 and TX3/RX5
on the top duplexer mounting bracket respectively, and next to each corresponding port on the
outside of the cabinet.
10
If the RFDS is installed, tie wrap the cables disconneted from the RFL + FWD ports of the
duplexers together and to the side at the cabinet.
11
This completes the Duplexer removal from the SC 614.
Figure E-3: I/O Cover
Apr 2001
SC
TM
V0E.02
ACCESS
PANEL
4812ET RF and Power Cabinet Hardware Installation Manual
DRAFT
Action
– continued
. . . continued on next page
161
E

Advertisement

Table of Contents
loading

Table of Contents