Cleanup the Site
Apr 2001
SC
TM
V06.03
Introduction
Cleanup the Site
Fill out Checklist
Optimize the System
Tables
Table 6-1: Installation Completion Checklist
Before Optimization/ATP performed, complete the following
procedures:
– Clean up the site.
– Fill out the installation completion checklist.
It is important that all shipping and installation materials to be discarded
be removed from the customer site. Return all tools to their proper place
and conduct a final inspection.
Remove Protective Covering
Remove any antistatic plastic or cloth sheeting that was used to cover the
equipment.
Pickup tools and leftover materials and debris
– Place all hand and power tools in the installation tool kit or other
appropriate place. Note any tools that need replacement, cleaning,
or adjustment.
– Place any leftover materials in a location specified by the site
manager.
– Remove any packing material.
– Ensure that all scrap materials have been removed from the site.
Environment
– Check that the power connections are tight.
4812ET RF and Power Cabinet Hardware Installation Manual
DRAFT
Chapter 6: What's Next and Cleanup
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
119
119
120
122
. . . . . . . . . . . . . . .
120
. . . continued on next page
119
6

Advertisement

Table of Contents
loading

Table of Contents