3.5 Installation Procedure

3.5.1 General

Installing the Searchline Excel Cross-Duct is done in two stages. First the duct is prepared, and the Excel
components mechanically fixed in place. Secondly, the electrical wiring is connected. The Transmitter and
Receiver assembly must be fully assembled and mounted to the duct structure before making the electrical
connections.

3.5.2 Mechanical Installation

Verify that the equipment to be installed is correct for the type of installation required (i.e. short or long range.)

3.5.2.1 Transmitter and Receiver Unit

Identify the holes in the mounting plate using the following drawing and table:
100mm
Searchline Excel Cross-Duct Technical Handbook
Identity Quantity
A
4
B
8
C
2
D
1
E
1
F
1
F1
4
G
4
H
2
NOTE: If unused, the top two
F1, top two G and the F holes
should be blanked off to avoid
leakage from the duct. Use
the 5 off M6 x 8 screws, single
coil washers and plain washers
supplied.
20
Size
Used for
M6 tapped
Mounting block mounting
Mounting plate to support
6.5mm
bar mounting
Clearance for support bar
14mm
fixing nuts
10mm
Drain for mounting block
Cross-Duct optical
25mm
measurement path
DVC100 (M) junction
box mounting
M6 tapped
(used in conjunction with
bottom two F1 holes)
DVC100 (M) MK2 junction
M6 tapped
box mounting
BARTEC junction box
M6 tapped
mounting
M10
DX100 (M) junction box
tapped
mounting