GE C70 Instruction Manual page 482

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

CONTROL ELEMENTS
CHAPTER 5: SETTINGS
2
2
— Selects a FLexLogic Operand to clear the accumulated I
t values (kA
-cycle), reset fault duration
BKR 1 CLR ARC AMPS
2
items (breaker operating time), clear ARCING AMPS (kA
-cycle) and AMP MAX (kA) values of the last event.
— This setting specifies the maximum symmetrical interruption rating of the circuit breaker.
BKR 1 INTERUPTION RATING
Figure 5-152: Arcing current measurement
5
5-278
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents