Cisco MEM-S1-128MB Installation Note page 6

Supervisor engine 1a dram upgrade
Table of Contents

Advertisement

Removing the MSFC2
Figure 2
Hold
here
Hold the top edge of the MSFC2 with your right hand and the bottom-left edge with your left hand.
Step 5
(See
Figure 1
November 2001.) Gently lift the MSFC2 with both hands simultaneously, and remove the MSFC2 from
the supervisor engine.
Caution
Use care not to damage the connectors on the supervisor engine. If you damage a connector, you will
have to return the supervisor engine to Cisco for repair.
Place the MSFC2 on an antistatic mat or antistatic foam pad.
Step 6
Proceed to the
Catalyst 6500 Series Supervisor Engine 1A DRAM Upgrade Installation Note
6
MSFC2 Shipped After November 2001—Removing Securing Screws
Hold here
SWITCH LOAD
WS-X5530
100%
1%
SUPERVISOR ENGINE I I I
CONSOLE
for an MSFC2 shipped before November 2001 or
"Upgrading the DRAM DIMM" section on page 7
Figure 2
for an MSFC2 shipped after
to install the DRAM.
78-14357-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents