Home And Office Set-Up - Cobra 25 LTD Installation Instructions Manual

Hide thumbs Also See for 25 LTD:
Table of Contents

Advertisement

Home And Office Set-Up

Base Station
Base Station Operation
(From 120V AC House Current)
Operation
(From 120V AC
To operate your transceiver from home or office
House Current)
you will need a 13.8 volt DC Power Pack rated at a
minimum of 2 amps, and a properly installed
base station antenna.
Warning!
Do not attempt to operate this
transceiver by connecting it
directly to 120 vac.
Simply connect the red (+) and black (-)
1
leads of the transceiver to the corresponding
terminals of the power pack.
Home And Office Set-Up
2
Plug power cable into back of unit marked
"Power". Be sure to observe polarity markings.
3
Connect properly installed and matched base
station antenna.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents