Mx-Pnx1A/B/C/D - Sharp MX-2300 G Installation Manual

Digital full color multifunctional system
Hide thumbs Also See for MX-2300 G:
Table of Contents

Advertisement

: Dec. 15 2005
1

[7] MX-PNX1A/B/C/D

MX2700N
1. Unpacking
A. Removal of the punch unit
B. Removal of the fixing tape
1)
Remove the fixing tape.
C. Check the packed items
1)
Check that all the items are included in the package.
1
No.
1
2
2. Installation
* When the punch unit is installed together with installation of
the MX-FNX1 (inner finisher), first install the inner finisher,
and then install the punch unit.
<Note before installation>
* Before starting installation, check to insure that the data lamp on
the operation panel does not light up or blink.
* Do not install the punch unit first because doing so would cause
interference between the inner finisher slide rail and the punch
unit drawer connector (possibly resulting in failure) when you
attempt to install the inner finisher.
A. Turn off the power of the main unit
1)
Turn OFF the power switch on the operation panel.
MX-2300/2700 N/G MX-PNX1A/B/C/D 7 – 1
1
Packed part names
Punch position label (For scanner)
Punch position label (For RSPF)
2
Quantity
1
1
OFF
OFF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx-2700 gMx-2300 nMx-2700 n

Table of Contents