Pioneer SC-99 Service Manual page 52

Hide thumbs Also See for SC-99:
Table of Contents

Advertisement

1
(10) Remove the PRE BRIDGE_M ASSY.
(11) Release the 7P cable (ADX7812: from
PRIMARY ASSY) from the PCB binder.
A
Note on assembling
∗20: Doesn't touch the cable to the capacitor,
heat sink and fuse.
fuse
B
BIND DM
CABLE_M ASSY
C
(12) Remove the Cushion Circle 14B.
(13) Remove the Insulating Sheet /68 (with the
nine Cushion Circle 14Bs).
(14) Remove the six screws. (BPZ30P100FTC)
(15) Remove the AC inlet by removing the two
screws. (CBZ30P080FTB)
(16) Remove the screw. (BPZ30P080FTB)
(17) Remove the 21 screws. (ABA1011)
D
(18) Unhook the hook.
E
[2-2] Diagnosis
(1) Arrange the unit as shown in the photo.
(2) Insert the insulation sheet.
F
52
1
2
Front
heat sink
∗20
capacitor
7P cable (ADX7812)
Front
DIGITAL MAIN ASSY
Front
2
3
DIGITAL MAIN ASSY
screwdriver
7P cable (ADX7812)
BIND DM CABLE_M ASSY
Insulating Sheet /68
17
:
x 21
16
18
Right Angle 85 (MTL)
SC-99
3
4
10
PRE BRIDGE_M ASSY
11
Cushion Circle 14B
x 10
13
AC inlet
14
x 6
Rear Panel
2
insulation sheet
4
12
15
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc-97Sc-lx89-kSc-lx89-sSc-lx79-kSc-lx79-s

Table of Contents