4 Installation and Commissioning
Installation and Commissioning
4
4.1
Hardware installation
The required hardware components are listed in
software components).
NOTICE
Always follow the installation guidelines for all components.
NOTICE
Before you switch on the power supply, complete and check the
installation!
The figure below shows the hardware configuration of the application.
Figure 4-1
PM 1507
24 V
230 V
PROFINET IE
Read/write data with IO-Link
Entry ID: 73565887,
V3.4,
CPU 1513-1 PN
24 V
ET 200SP
06/2022
Chapter 2.3.2
PG/PC
24 V
CM 4xIO-Link
(used hardware and
MDS Dxx
RF220R
(V1.0)
21