4-7-4.
CP-407A Board
Preparation
1.
Refer to
"4-2. Flow
Chart".
Procedure
1.
Loosen the two attached screws.
2.
Remove the CP-407A board from the two connectors on the MB-1206 board.
Attached screw
3.
Install the removed parts by reversing the steps of removal.
PWS-4400
CP-407A board
Attached screw
Connectors (MB-1206 board)
4-29