Toro Groundsmaster 4100-D Service Manual page 153

Hide thumbs Also See for Groundsmaster 4100-D:
Table of Contents

Advertisement

Removal
1. Park machine on a level surface, lower cutting
decks, stop engine, engage parking brake, and remove
key from the ignition switch.
2. Read the General Precautions for Removing and
Installing Hydraulic System Components at the begin-
ning of the Service and Repairs section of this chapter.
3. Drain reservoir into a suitable container (see Opera-
tor's Manual).
4. Disconnect hydraulic hoses from reservoir.
5. Remove hydraulic reservoir using Figure 86 as a
guide.
Groundsmaster 4100--D
Inspection
1. Clean hydraulic reservoir and suction strainer with
solvent.
2. Inspect for leaks, cracks, or other damage.
Installation
1. Install reservoir using Figure 86 as a guide.
2. Using a wrench, turn strainer into port 1--1/2 to 2 full
turns beyond finger tight.
3. Reconnect hydraulic hoses.
4. Fill reservoir with hydraulic fluid as required (see Op-
erator's Manual).
Page 4 - - 111
Hydraulic System

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

30411

Table of Contents