Connecting The Wire Harnesses; Connecting The Ten Pole Connector The Switch Panel And The Engine And Actuator; Connecting The Three Pole Connector Between The Junction Unit And The Actuator - Yamaha T8 Rigging Manual

Hide thumbs Also See for T8:
Table of Contents

Advertisement

CONNECTING THE WIRE HARNESS
CAUTION:
Length of the extension wire harness
should be 6m (20 ft.) or less.
Use of longer harness may cause defective
operation of the acutator.
1.

CONNECTING THE WIRE HARNESSES

FOR THE UPPER STATIONS
1) Feed the wire harness between the
first and second station. If may be nec-
essary to disconnect the individual bul-
let connectors located near the multi-
pin connectors for the second station.
CAUTION:
Ensure that the proper wire color codes are
maintained when reconnecting the individ-
ual bullet connectors or improper opera-
tion may result.
2) Connect the matching connectors for
the second station control, switch
panel, and instruments.
2.
CONNECTING THE WIRING FOR THE
LOWER STATION
1) Connect the matching connectors for
the first station control, switch panel,
and instruments.
2) Connect the matching connectors
between the dual station harness and
the engine wire harnesses.
3.
CONNECT THE SHIFT ACTUATOR AND
JUNCTION UNIT
1) Connect the actuator main wire har-
ness between the dual station main
wire harness and the engine main wire
harness matching connector plugs.
Connect the ten-pole connector to the
actuator unit.
2) Connect the three-pole connector
between the junction unit and the actu-
ator.
10A-23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents