end of the network cable has been connected to the AI/DI port on the rack
environment unit.
Context
Procedure
Step 1 Set water sensor parameters.
1.
2.
3.
4.
5.
6.
7.
8.
Step 2 Check functions of water sensors.
Table 5-9 Function check
Check Method
Immerse the two
contacts of the
electrode water
sensor in water.
----End
Issue 01 (2020-11-30)
To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. The specific alarm then can be reported.
If the sensor is prefabricated, only check its settings.
The actual value prevails. Only the method of the parameter settings is
described.
NO TE
The following describes how to connect a water sensor to the AI/DI_2 port on the ECC800-
Pro.
Log in to the ECC800-Pro WebUI as an administrator.
Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
Set Device type to ECC800, set Device name to ECC800, and click OK.
On the query result tab page, set the new signal name of AI/DI_2 to Leak
and click Submit.
Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.
Set Leak sensor to Enable and click Submit.
Set Leak sensor type to Leak sensor(Electroc) and click Submit.
Click Unhide All Advanced Signals, and click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.
Normal Connection Status
Leak DI alarm is generated
on the active alarm screen of
the app or on the WebUI.
Copyright © Huawei Technologies Co., Ltd.
5 Power-On Commissioning
Alarm Clearance Method
Wipe dry the two contacts of
the water sensor. The alarm
disappears automatically.