(f) Parts Replacement
This is an item to be used when replacing parts.
When "5. Parts Replacement" in the main menu is selected, the following submenu opens.
1) BE-28 Board Replacement
This is an item to be used when replacing the BE-28 board.
When the submenu item "1. BE-28 Board Replacement" is selected, the following submenu opens. Execute this item
when replacing the BE-28 board.
Before Board Replacement
Execute this before removing the defective BE-28 board. The following items are executed.
. Read Log (SYSCON error log read check)
. Main Device Check (Internal check program for Cell/B.E., RSX, and SCC)
. Save FAN Hm (Saving FAN Hours Meter to a file)
BCU-100 MM
1-33 (E)