NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual
Figure 6-26 Removing an upflow PSU
Figure 6-27 Removing a downflow PSU
Step 3 Take out the handle and pull out the PSU from the subrack, as shown by (2) in
Figure
When installing a new PSU, ensure that the handle is in the lower part of the PSU.
Step 4 Insert the spare PSU into the corresponding slot of the power distribution subrack,
and push the latch downwards to lock the PSU.
----End
Issue 02 (2020-08-30)
6-26.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
6 System Operation and Maintenance
175