Self-Check During System Run Start; Self-Check During Scan - Toshiba V Series User Manual

Sequence controllers
Hide thumbs Also See for V Series:
Table of Contents

Advertisement

Chapter 6 Troubleshooting
6
174
(2) Self-check during RUN start
Table 6-4 Self-check during system RUN start
Check item
Self-check
I/O bus error
Checks that the I/O bus
is normal.
Basic unit
Checks that the CPU
configuration
module configuration is
identical to that
registered in the
engineering tool.
I/O module
Checks that the I/O
configuration
allocation data
coincides with I/O
module
implementation.
Registered I/O
Checks that the
interrupt module
module allocated in I/O
interrupt module
registration data is an
interrupt module.
Logical table
Checks that module
error
parameters are
registered correctly.
Scan cycle
Checks that scan cycle
setting
of scan tasks (SS/HS/
MS) is within allowable
range.
Validity of user
Checks validity of the
program
program operation unit
(POU) with BCC.

(3) Self-check during scan

Check item
Self-check
I/O bus error
Checks the
occurrence of errors
during I/O access.
Batch I/O parity
Checks I/O parity
error
error during batch I/
O.
Operation when
error is detected
Error down after
error entry
Error down after
error entry
Error down after
error entry
Error down after
error entry
Error down after
error entry
Error down after
error entry
Error down after
error entry
Table 6-5 Self-check during scan
Operation when error is
detected
Retries after error
entry. If the I/O bus is
normal, attention and
continues operation. If
the I/O bus is not
normal, degeneration
or error down.
Retries after error
entry. If the I/O bus is
normal, attention and
continues operation. If
the I/O bus is not
normal, degeneration
or error down
model 2000 Sequence Controller S2 User's Manual -Basic Hardware-
Operator action
Check cable connection
between I/O units and
installation of the I/O module. If
connection is normal, contact a
Toshiba agent.
Match the registered core unit
configuration with
implementation.
Match the registered I/O module
configuration with
implementation.
Match the registered I/O
interrupt modules to
implementation.
Check the logical table using the
tool, and reload the table.
Load system data including
programs from the tool, and
restart the system. Or, contact
a Toshiba agent.
Load programs from the tool,
and restart the system.
Operator action
Check cable connection
between I/O units and
installation of the I/O module.
If connection is normal,
contact a Toshiba agent.
Check cable connection and
installation of I/O module. If
connection is normal, replace
the I/O module or I/O cable.

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000

Table of Contents