5 Software Conversion
Step
4.
Check the result of the migration process with the migration protocol.
5.
If necessary, adapt the project.
6.
Compile the migrated project.
7.
If required, rectify the fault.
8.
If required, carry out further steps.
Migration S7-300/S7-400 nach S7-1500
Entry ID: 109478811,
V1.1,
Instruction
05/2017
48