Filling The System - Bosch 12/18 Instruction Manual

Floor standing external oil fired condensing combination boiler using balanced flue system
Table of Contents

Advertisement

1
B
A
C
2
3
D
4
E
E
5
6
B
C
A
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389b (09/07)
1 - 2 bar
F

FILLING THE SYSTEM

1
Pull lever (C) up and push to the left to
move the diverter valve to the mid-position
between ports A and B.
Push and hold lever (C) down to lock.
2
Loosen the automatic air vent cover.
4
Sealed systems only; check and if required,
adjust the expansion vessel pressure using
the Schraeder type valve (D).
The charge pressure of the built-in 12 Litre
expansion vessel is 0.5 bar as dispatched,
which is equivalent to a static head of 5
metres (16.7 ft).
Total system
Initial system
Initial charge
volume (litres)
pressure (bar)
pressure (bar)
180
0.5
107
1.0
138
1.0
If an extra expansion vessel is fitted to the
central heating return, adjust this to the same
pressure as the appliance internal expansion
vessel, refer to separate instructions supplied
with the extra expansion vessel.
4
Open all system and radiator valves (E).
Turn on the water main stop cock.
Open vented systems only; turn on the
water to the system feed and expansion
cistern and allow the system to fill.
Sealed systems only; fill the system to
between 1 and 2 bar pressure via a WRAS
approved filling link. Monitor the pressure
gauge during venting and repressurise if
required.
Check air is being discharged from the
automatic air vent.
Vent all radiators, retighten when completed,
check the system and correct any leaks.
Bleed air from both of the secondary heat
exchanger air vents (F).
Bleed air from the pipework using the
pump bleed screw.
5
Sealed systems only; connect a suitable
hose to the Heatslave tank drain. Open the
drain valve to reduce the system to the
correct pressure, then close the drain valve.
Ensure safe disposal of the discharge.
Rotate the adjustable pointer on the
pressure gauge to record the set system
pressure.
6
Check system and rectify any leaks.
Push lever (C) to the left and pull
upwards to allow the lever to return to
position A.
Leave the lever (C) unlocked at
position A.
FILLING THE SYSTEM
0.5
0.5
1.0
30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents