Unpacking The Boiler; Short Parts List - Bosch 12/18 Instruction Manual

Floor standing external oil fired condensing combination boiler using balanced flue system
Table of Contents

Advertisement

IIMPORTANT: All the previous Pre-Installation sections must be read
and requirements met before starting boiler or flue installation.
1
2
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389b (09/07)

UNPACKING THE BOILER

LIFTING AND CARRYING PRECAUTIONS:
Lift only a manageable weight, or ask for
help.
• When lifting or putting things down, bend
the knees, and keep the back straight
and feet apart.
• Do not lift and twist at the same time.
• Lift and carry objects close to the body.
• Wear protective clothing and gloves to
protect from any sharp edges.
Unpacking:
It is advised that two or more persons are involved
in the transfer of the packaged boiler from the van
to the point of delivery.
1
Once the packaged boiler has been
delivered, the outer carton is removed first.
Care should be taken when releasing the
straps. If a sharp implement is used make sure
the outer carton is not pierced and that the
implement is used in such a way so that it may
not cause personal injury. All sharp objects
must be covered or the blade retracted after
use and put away in a safe place.
2
Lift carton up and away from the boiler.
Remove the plastic bag from the boiler and
place safely aside.
UNPACKING THE BOILER
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents