Boiler Location & Clearances - Bosch 12/18 Instruction Manual

Floor standing external oil fired condensing combination boiler using balanced flue system
Table of Contents

Advertisement

600mm
600mm
(min)
10mm
2500mm*
13
BOILER LOCATION &
CLEARANCES
600mm
BASE
2500mm*
Plan
85mm
view
FRONT
600mm
150mm**
10mm
Plan
view
FRONT
600mm
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
BOILER LOCATION &
CLEARANCES
WARNING:
This appliance should not be installed where
there is a potential for excessive ground
water coverage.
This boiler is only suitable for installing
externally at a suitable location onto a fixed
permanent rigid surface c apable of
supporting the boiler weight.
2500mm*
There must be a sufficient hard standing
around the appliance to allow for servicing.
The boiler must be installed on a flat level
surface to ensure that condensate does not
enter the primary heat exchanger.
Tarmac and wood hardstandings are not
recommended.
CLEARANCES: Min service & flue clearances
Above
Front
RH/LH flue outlet on opposite side
RH flue outlet on rear
LH flue outlet on rear
Rear = flue outlet on side
Rear = rear flue outlet
It is strongly recommended that the flue
terminal faces away from walls to reduce
the possibility of wetting occuring.
*This can be reduced to 1200mm if there is at
least 2500mm clearance on both sides of the
flue.
** 200mm if a high level terminal is used exiting
through the rear panel.
150mm**
10mm
Plan
view
FRONT
600mm
600mm
600mm
10mm
85mm
10mm
150mm**
2500mm*
2500mm*
8 716 113 389b (09/07)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents