Figure 38. Hru Marking Dimensions - Samsung 5G NR Installation Manual

Hybrid radio unit
Table of Contents

Advertisement

System Leveling to check the positions are marked to be horizontal or vertical
before drilling. If the result shows they are not horizontal or vertical, modify the
marking positions.
When the position where the system will be placed is determined, place the system
on that position and then mark the positions where anchor bolts will be fixed. This
will reduce marking error range.
1
Figure 38.
HRU Marking Dimensions
2
3
5G NR HRU Installation Manual v1.0
Copyright © 2018, All Rights Reserved.
Check the distance between the location for fixing the HRU and the anchor
bolt hole.
[Rear View]
Place a mounting bracket on the fixing location, and then check the level status
using a level and adjust the level of bracket assembly.
If the level status is normal, mark the anchor bolt holes on a wall.
Chapter 2 Installing System
Unit: in (mm).
10.04 (255)
2.46 (62.5)
5.12 (130)
Confidential
: Anchor Bolt Hole
2.46 (62.5)
40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents