Section 11
Testing functionality by secondary injection
IEC07000188 V1 EN-US
Figure 35: Test of RTC with I/O
11.16
Basic IED functions
11.16.1
Parameter setting group handling SETGRPS
Prepare the IED for verification of settings as outlined in section
chapter.
11.16.1.1
Verifying the settings
1.
Check the configuration of binary inputs that control the selection of the active setting
group.
2.
Browse to the ActiveGroup menu to achieve information about the active setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test/Function
status/Setting groups/ActiveGroup
The ActiveGroup menu is located on the PCM600 underMain menu/Test/Function
status/Setting groups/ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the IED and
observe the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting groups
are described in the corresponding PCM600 documents and instructions for the
operators within the SCS are included in the SCS documentation.
11.16.1.2
Completing the test
continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
186
© Copyright 2017 ABB. All rights reserved
1MRK 511 403-UEN E
SEMOD52026-1 v1
"Preparing for test"
in this
TESTMODE setting to Off .
Bay control REC670
Commissioning manual
M11369-2 v4
M11369-4 v5
M11369-39 v4