Section 11
Testing functionality by secondary injection
7.
Switch the fault current on (110% of the set operating current) and wait longer than the
set value
8.
Switch the fault current off.
9.
Reset the CR binary input.
10.
Activate the BLOCK digital input.
11.
Switch the fault current on (110% of the set operating current) and wait for a period
longer than the set value
12.
Switch the fault current and the polarizing voltage off.
13.
Reset the BLOCK digital input.
Permissive scheme
1.
Inject the polarizing voltage 3U0, which is 5% of
lagging the voltage by 65°.
2.
Inject current (65° lagging the voltage) into one phase at about 110% of the set operating
current, and switch the current off with the switch.
3.
Switch the fault current on, (110% of the set operating current) and wait longer than the
set value
4.
Switch the fault current off.
5.
Activate the CR binary input.
6.
Switch the fault current on (110% of the set operating current) and measure the
operating time of the ECPSCH logic.
Use the TRIP signal from the configured binary output to stop the timer.
7.
Compare the measured time with the setting for
8.
Activate the BLOCK digital input.
9.
Switch the fault current on (110% of the set operating current) and wait for a period
longer than the set value
10.
Switch the fault current and the polarizing voltage off.
11.
Reset the CR binary input and the BLOCK digital input.
11.10.4.2

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
168
tCoord .
No TRIP signal should appear.
tCoord .
No TRIP signal should appear.
tCoord .
No TRIP signal should appear, and the CS binary output should be
activated.
tCoord .
No TRIP signal should appear.
© Copyright 2017 ABB. All rights reserved
UBase (EF4PTOC) where the current is
tCoord .
TESTMODE setting to Off .
Commissioning manual
1MRK 511 403-UEN E
M13926-42 v8
M13926-71 v5
Bay control REC670

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents