Section 11
Testing functionality by secondary injection
6.
Check the time until the warning limit has reached
Monitor the signal WARNING1 until it appears on the corresponding binary output.
7.
Compare the measured temperature (HPTMPMAX) with
8.
check the time until the warning limit has reached
Monitor the signal WARNING2 until it appears on the corresponding binary output.
9.
Compare the measured temperature (HPTMPMAX) with
10.
Wait for a time corresponding to
signal. Make sure that the ALARM1 signal appears.
11.
Note the time taken for the appearance of ALARM1 signal from the appearance of
WARNING1 signal, and compare it with set value (
12.
Wait for a time corresponding to
signal, and make sure that the ALARM2 signal appears.
13.
Note the time taken for the appearance of ALARM2 signal from the appearance of
WARNING2 signal, and compare it with set value (
14.
Activate the BLKWRN binary input. The WARNING1 and WARNING2 signals should
disappear.
15.
Activate the BLKALM binary input. The ALARM1 and ALARM2 signals should disappear.
16.
Reset the BLKWRN and BLKALM binary inputs. Once again warning and alarm signals
should appear.
17.
Reduce the three-phase currents suddenly to value lower than the rated current and take
note of hot spot temperature.
18.
Check the warnings reset limit (
signals until they disappears on the corresponding binary outputs. Take the HPTMPMAX
readings and compare with the reset level settings.
Verifying LOLINDAY and LOLINYRS outputs
1.
Connect the test set for injection of three-phase currents to the appropriate current
terminals of the IED.
2.
Make sure that the settings in the IED are appropriate, especially set the
setting as Enable,
3.
Activate the TOTVALID input and set some temperature value in TOTEMP input.
4.
Supply the IED with three-phase currents slightly more than the rated value.
5.
Note the hot spot temperature (HPTMPMAX) and maintain it for another 1 hour.
6.
Check the LOLINDAY and LOLINYRS outputs after 1 hour and compare it with the
calculated loss of life value using IEC standard method.
11.12.7.2

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.12.8

Through fault monitoring PTRSTHR

Prepare the IED for verification of settings outlined in Section
settings".
11.12.8.1

Verifying the signals and settings

The voltage or current can be injected using a common test equipment.
180
tDelayToAlarm1 from the appearance of WARNING1
tDelayToAlarm2 from the appearance of WARNING2
HystAbsHPT ). Monitor the WARNING1 and WARNING2
TimeToUpdate setting as 1 hour and AgeingRateMeth setting as IEC .
© Copyright 2017 ABB. All rights reserved
WrnHPTmpLev1 level during injection.
WrnHPTmpLev1 setting.
WrnHPTmpLev2 level during injection.
WrnHPTmpLev2 setting.
tDelayToAlarm1 ).
tDelayToAlarm2 ).
GUID-C1B747CC-F961-4C6B-BB72-5F32B3FB3F06 v1
GUID-46EC57EA-375B-4DBD-BE18-914156083384 v1
Test mode setting to Off .
GUID-7AE60CB5-3CD5-4FE2-8D54-664AA78DD2DE v1
GUID-079BCF22-469C-42EA-B857-E28154EC13D9 v1
"Preparing the IED to verify
GUID-0295EF7C-217E-4400-B7C2-68C00A38ADF3 v1
Commissioning manual
1MRK 511 403-UEN E
EnaAgeCalc
Bay control REC670

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents