Huawei FusionModule1000A40 ICT Solution Maintenance Manual page 93

Hide thumbs Also See for FusionModule1000A40 ICT Solution:
Table of Contents

Advertisement

FusionModule1000A40 ICT Solution
Maintenance Guide
(1) 1.5 m long DN32 steel pipe
7.
Adjust the positions of the two steel pipes and the distance in between to ensure that the air
conditioner is evenly carried on the two steel pipes.
Issue 01 (2019-03-05)
Figure 4-31 Pushing the air conditioner (2)
Continue pushing forward the air conditioner until it is separated from the base and
placed onto the two steel pipes.
Copyright © Huawei Technologies Co., Ltd.
4 Parts Replacement
86

Advertisement

Table of Contents
loading

Table of Contents