Huawei FusionModule1000A40 ICT Solution Maintenance Manual page 102

Hide thumbs Also See for FusionModule1000A40 ICT Solution:
Table of Contents

Advertisement

FusionModule1000A40 ICT Solution
Maintenance Guide
Impact on the System
The ECC800 may be powered off.
Preparations
Tools: insulation gloves
Materials: spare ECC800 PSU
Documents: ECC800 user manual
Skill requirement: extra low voltage (ELV) engineer
Procedure
Step 1 Push the locking latch in the upper right corner of the ECC800 PSU panel leftwards to open
the lock.
Step 2 Pull out ECC800 PSU from the subrack by the handle.
Step 3 Place a spare ECC800 PSU in the subrack, push the locking latch leftwards to open the lock,
and pull the handle outwards.
Step 4 Gently push the ECC800 PSU into the subrack along guide rails, and push the locking latch
rightwards to secure the handle.
Figure 4-40 Replacing an ECC800 PSU
----End
Follow-up Procedure
Dispose of the removed ECC800 PSU that is confirmed faulty.
Issue 01 (2019-03-05)
A PSU is hot-swappable.
Do not touch the terminals in the rear of a removed PSU to avoid electric shocks.