Restart Sms Server; Restart Sms Server Application; System Startup; System Shutdown - Sony LMT-300 User Manual

Screen management system projectionist terminal
Hide thumbs Also See for LMT-300:
Table of Contents

Advertisement

Restart SMS Server

The SMS System allows the operator to Restart the SMS
Server application and, optionally
Shutdown from the Projectionist Terminal. Access to the
System Shutdown function is configured during
installation.

Restart SMS Server Application

Should restarting of the SMS
Server application become
necessary you can realize this from
the Projectionist Terminal. To
Restart SMS Server, tap Menu and
then tap Restart SMS Server.
During the process of restarting the
SMS Server the Projectionist
Terminal will be insensitive to user
input for a period of up to 4 or 5
minutes. During this period of time
the projectionist Terminal may go
blank or only display the CineAlta
screen (below) without the Login
button. Once the Restart process has completed the normal
Login screen appears.
Login to the Projectionist Terminal and review the various
status screens.
1.Locally configured during system installation.
1
, execute a System
Tap
Restart SMS Server

System Startup

During hours where the theater is not operating, the
Auditorium Unit is usually Shutdown and AC-mains is
switched OFF at a circuit breaker panel.
To return the Auditorium Unit to an operational state,
restore AC-mains power to the system.
During the startup process various messages will appear on
the Projectionist Terminal. Once Startup has completed
the Login screen appears (shown below).
Login to the Projectionist Terminal and review the various
status screens. The Projector remains in STANDBY mode
and the Lamp is not illuminated even if the LAMP circuit
breaker is set to ON.
Note: You must Login to either the Projectionist Terminal
or the SMS Controller as a User with access to the
Initialize Security process to Initialize the Cavity
Security System. Once the CSS has been initialized
KDM(s) which have been previously ingested as
appropriate to the DCP content present on the RAID will
be available and presentation can be realized.

System Shutdown

The Auditorium Unit power is comprised of a three-phase
feed which supplies the operating voltage required for the
Lamp, a single-phase feed which supplies the operating
voltage to the Projector (except for the Lamp)
single-phase feed which supplies power via an internal
UPS to other subsystems in the Auditorium Unit. Two
circuit breakers are located on the rear of the SRX-R320
system which supply power to only the Projector portion
of the Auditorium Unit.
Shutdown for the SRX-R320 based projection system
takes into account continuing cooling for the Lamp after it
2.This single-phase feed may not be present in all loca-
tions if this power requirement is met via the UPS. In this
case the UPS may need to be resized to accommodate the
additional load.
2
, and a
52
Restart SMS Server

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents