3.5 Installation Verification

Table 3-2
Table 3-2 Installation verification checklist
No.
1
2
3
4
5
6
7
Issue 15 (2019-12-19)
Figure 3-21 Connecting cables to the 3KRTL UPS input
gives the installation verification checklist.
Item
Cable routing
Cable connections
Cable connections for
USB ports and network
ports
Cable labels
Ground cable
connection
Distances between cable
ties
Operating environment
Copyright © Huawei Technologies Co., Ltd.
Acceptance Criterion
Cable routing meets engineering requirements.
Power cables and battery cables are tightened to
specified torques using a torque wrench, connected
correctly, and free of damage.
Cables to USB ports and network ports are connected
correctly and securely.
Labels are neatly attached to both ends of each cable,
and the information on the labels is concise and
understandable.
The ground cable is securely connected to the
equipment room ground bar. Measure the resistance
between the UPS ground cable and the equipment room
ground bar, which must be less than 0.1 ohm.
Distances between cable ties are the same, and no burr
exists.
Clean the conductive air and other sundries.