6 Operation
6.1 Preparing the Amersham Typhoon scanner
6.1.1 Starting the system
Step
96
Action
When the Amersham Typhoon Control Software is ready, the main window
is displayed. See
Example of the main window, on page
The instrument status is displayed in the Status field, see also
status, on page
64.
Amersham Typhoon Operating Instructions 29193226 AC
59.
Instrument