GE Amersham Typhoon Operating Instructions Manual page 95

Table of Contents

Advertisement

Step
Start the Amersham Typhoon
Control Software
Step
1
Amersham Typhoon Operating Instructions 29193226 AC
Action
The following will occur:
The Ready LED flashes.
The instrument will make one beeping sound within 5 minutes after the
On/Off button is pushed.
The Ready LED is lit.
Result: Amersham Typhoon scanner is ready for operation.
Action
Start Amersham Typhoon Control Software from the Start menu, or use the
desktop shortcut.
The following window is displayed while the Amersham Typhoon Control
Software is launched.
6.1 Preparing the Amersham Typhoon scanner
6.1.1 Starting the system
6 Operation
95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents