START UP COMPONENTS
Discharge Air Temperature Sensor
Units are supplied with a Discharge Air Temperature Sensor that is to be field-installed prior to unit
start- up. Installing the Discharge Air Temperature Sensor is required for proper operation.
The sensor is to be installed at least three duct diameters downstream of the heat exchanger.
The sensor must be connected directly to the microprocessor controller. All other sensors and low
voltage devices are to be connected to the low voltage terminal strip in the control center. The
discharge air sensor is shipped loose and can be found in the unit's control center. See the unit-
specific wiring diagram for connection locations.
Airflow Monitoring
For additional information on how to navigate through the airflow controller menus, refer to techni-
cal manuals from GreenTrol® Automation Inc. at www.greentrol.com.
Display and Navigation
The LCD screen will by default show the current airflow that is being measured. To enter the menu to set up the monitoring station the user
must remove the front cover of the GreenTrol to uncover the navigation buttons.
Press and hold the UP and DOWN keys at the same time for 3 seconds to enter the menu.
• Enter Button Function - The ENTER button allows the user to go into the selected menu or function, as well as save the selected value.
• Up/Down Button Function - The UP/DOWN buttons are used to navigate the menu and to change values in the menu.
• Esc Button Function - The ESC button allows the user to exit the current menu or function.
Field Calibration
1. Press UP/DOWN = Setup
2. Press DOWN/ENTER = Setup Wizard
3. Scroll Down to Field Adjust and press ENTER
4. Run FAK wizard and press ENTER
5. Set FAW Int and press ENTER
6. FAW INT = 300 and press ENTER
7. Set number of flows and press ENTER
8. Set flow and press ENTER
9. Set flow to actual CFM measured by Test and Balance and press ENTER
10. Wait for calibration before cycling power
11. Proceed to Communication Setup
Due to our policy of continuous product innovation, some specifications may change without notification.
48
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.

Advertisement

Table of Contents
loading

Table of Contents