LG AR-DR12-05A Installation And Operation Manual page 31

Rooftop dedicated outdoor air system doas vx, base rooftop doas 800 to 5750 cfm, energy recovery wheel rooftop doas 900 to 9550 cfm
Hide thumbs Also See for AR-DR12-05A:
Table of Contents

Advertisement

Bird Screen Assembly
These steps are to be performed after completing
Steps 1-12 of the OA Hood Assembly process,
starting on page 154.
1. Position the SCREEN CENTER SUPPORT
(item #4) so that the pre-punched holes in
the BOTTOM FLASHING (item #11) and
HOOD END (item #3) are aligned. Fasten
with #8-18x1/2 Phillips flat-head sheet-metal
screws, as shown below.
For 350/352 casing:
Repeat this step for each of the two
additional screen supports (item #4),
spanning the width of the hood.
4
Step 1: Install screen center support.
2. Slide FRAMED BIRD SCREEN(s) (item #15)
into the slits between the side triangles
(items #9 and #10) and the screen side
supports (item #2).
3. Fasten the perimeter of the FRAMED BIRD
SCREEN(s) to the hood assembly using
5/16" sheet-metal screws spaced at 12"
centers, as shown in the following figure.
15
Step 3: Install perimeter screws at 12" centers.
OUTDOOR AIR HOOD ASSEMBLY
3
11
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
4. Position SCREEN SUPPORT FLASHING
(item #5) on top of the screen and align over
the SCREEN CENTER SUPPORT (item
#4). Secure in place with 5/16" sheet-metal
screws.
For 350/352 casing:
Secure each of the two additional screen
support flashings over the other two screen
supports.
5
Step 4: Install screen support flashing.
OA Hood assembly with bird screen is complete.
31

Advertisement

Table of Contents
loading

Table of Contents